Project Cost: Confidential

Size: 150,000 SF

TMRW Sports

SoFi Center

Palm Beach, FL

The SoFi Center is an innovative, technology-driven arena designed to redefine the golf fan experience. Located on the campus of Palm Beach State College, the nearly 150,000-square-foot facility serves as the primary venue for TGL, a new golf league created by TMRW Sports. Built to deliver a fully immersive, “greenside” viewing experience, the arena blends live competition with advanced simulation, broadcast integration, and fan engagement to establish a new standard in sports and entertainment.

The facility features a 64-foot-high by 46-foot-wide simulator screen powered by Full Swing technology, a dynamic short-game complex with three sand bunkers, and three individual 15-foot by 27-foot Virtual Greens set within a 3,800-square-foot putting surface. The playing field is approximately the size of a football field and is complemented by seating for nearly 2,000 fans on match nights, along with an outdoor plaza designed for pre-match gatherings and events. The venue is fully ADA accessible, ensuring an inclusive experience for all visitors.

Pure Project Management was initially engaged to supplement an existing nationally recognized sports owner’s representative. As project complexity increased and schedule pressures intensified, PurePM was asked to step into a leadership role and ultimately assume full responsibility for project delivery. At the time of transition, the project faced a highly compressed schedule tied to a fixed, non-negotiable national broadcast debut on January 7, 2025 on ESPN.

The SoFi Center presented a level of complexity far beyond that of a conventional arena. The project required seamless integration of advanced broadcast systems, immersive audiovisual and electronic gameplay technology, specialty structural systems, and more than 30 owner-direct vendor contracts, all while coordinating national media and sponsorship requirements. In response, PurePM established a structured and disciplined approach to execution, implementing clear reporting protocols, reorganizing schedule sequencing, and creating a unified plan that aligned all stakeholders.

Working in close collaboration with contractors, consultants, Palm Beach State College, and TMRW Sports leadership, PurePM drove design completion and oversaw construction of the facility, including delivery of the broadcast studio within an accelerated timeline of less than 12 months. The team maintained rigorous milestone tracking, coordinated complex MEP and technology infrastructure, and ensured accountability across all parties involved.

Through proactive leadership and hands-on management, PurePM successfully guided the project to completion, delivering a world-class venue on schedule. The SoFi Center opened as planned and launched nationally on ESPN, marking a successful debut for both the facility and the TGL league, and establishing a new benchmark for integrated sports and entertainment environments.